Testing Documentation

The following documents can be downloaded in PDF format by clicking on the corresponding document name.

Download Adobe Acrobat to view PDF files.

 

»

CLEC Pre-Ordering/Ordering Interface TPP
(Testing Practices and Procedures)
Version 5.0.0- Last Updated 7/9/09

This document describes the AT&TTesting Practices and Procedures (TPP), as they relate to our electronic interface pre-ordering and ordering testing with new and existing CLECs/WSPs/Vendors.

   
»

Encore Test Case Catalog (TCC) Index
The section contains an index of the latest version of the Test Case Catalog (TCC). The TCC provides test data reflecting a broad sampling of the order and pre-order scenarios available in the AT&T OSS's.

   
»

Sample Integrated Test Plan and Status Report
This test plan will serve as a cumulative log of the CLECs/WSPs/Vendors testing activities, issues, and progress throughout all phases of testing with AT&T

   
»

Documentation Issues Form (9/21/05)
This forms is used by customers to refer documentation issues to AT&T. The CLEC/WSP/Vendor will fill in the form and e-mail to the CLEC test manager.

   
»

Overview of AT&TICS LAN-to-LAN capability (8/31/07)
This document describes AT&T's capability of providing LAN-to-LAN connectivity (TCP/IP gateway over a dedicated facility) for AT&T ICS customers to access designated AT&Tsystems as appropriate.

   
»

CM-10 Software Validation Test Deck (3/10/05)
This document contains the Change Management 10 (CM-10) Software Validation Test Deck for the present Encore production release.

   
»

Archived Forms and Documents
This section contains copies of electronic interface implementation forms that can be used during TEST system outages.

Tools & Processes
»
»
»
CLEC Test Pages
»
»
»
»
»
»
»
»